Pool Update
I cleaned up all the dirt off the concrete in the pit… I can lay the flag now. I also put up some clay bricks between the back of the BBQ and the PVC pipes. I am a little worried about them.
Pool Update
I felt decent so I figured I’d lay the flagstone for the counter top. I got most of it done. I just need to cut one or two filler pieces and then trim the pieces overhanging the bbq and burner cutouts. I put a level across when I was all done. The middle “finger” is low nearly 3/4 of an inch. I knew this would happen… hopefully it doesn’t look too bad when I slap the grill up!
Pool Update
I dislocated my shoulder for the 138th time. This was a first though… it never went back in. I had to take a trip to the hospital. They knocked my ass out and re-set it. All is well now but it will be a couple days before the pain goes down enough for me to do any more work. OH! I forgot…. my surgery was moved up to September 23rd so my deadline is now this coming weekend. I think I will make it provided my shoulder stays were it should…
Pool Update
I am back from San Diego unfortunately. I layed a little block tonight. I can’t go much further until I get the electrical all sorted. I have to tie in the electrical to the sump with the outlet on the countertop. I need to head to Lowe’s tomorrow… if I can… Mom is moving in to her new house this week. I have a feeling I am going to be doing quite a bit of moving.








